Carf-Models BAE Hawk Mk 66 Assembly Manual page 17

Skygate series
Hide thumbs Also See for BAE Hawk Mk 66:
Table of Contents

Advertisement

Fig. 37
The aileron servo linkage is made up using the M3 x 90mm threaded rod with 3mm ball link at one end
and M3 aluminium clevis with 3mm pin at the servo end. Add a length of brass or carbon tube to the
outside of the pushrod for extra strength if deired. Attach the ball link end to the aileron horns with the M3
x 15 allen screw and nyloc nut supplied. Once you are happy with aileron throws and movement you can
affix the supplied plastic fairings to cover the mechansim. The servo hatch / mount is fixed to the wing
with 2.9 x 10mm sheet metal screws.
Fig. 39
Flap
The flap surfaces are installed for you at the factory
with beautiful scale hinging. What remains is for you to
install the servo and linkage. CARF Models
recommend a 25kg torque digital servo like the JR
DS8711 for the flap surfaces.
We have used a JR aluminium arm at 38mm between
centres for the flap. Drill the servo arm at 38mm Ø3mm
and install the aluminium clevis supplied. Install the
17
Skygate Collection
BAE Hawk Mk 66
Fig. 38
Fig. 40
Fig. 41

Advertisement

Table of Contents
loading

Table of Contents