Installation Planning; Installation; Unpack Appliance; Fit Standoffs - Valor 1500INO Installation & Owner's Manual

L1 series dv zc gas fireplace for outdoor use
Hide thumbs Also See for 1500INO:
Table of Contents

Advertisement

QUALIFIED
INSTALLER
Installer—READ THIS FIRST
Only qualifi ed licensed or trained personnel
should install this appliance.
1. YOU NEED TO KNOW FROM THE
HOMEOWNER:
- The height of the unit and hearth if used;
- The thickness and type of the wall fi nish
around the fi rebox opening;
- What accessories (trim, etc.) will be installed
with this fi replace;
- The venting confi guration.
2. Unpack the appliance, removing all items packed
inside and around the appliance.
3. Check that you have everything, using the Pack
Content sheet. Also, check that you have:
◊ a fuel bed (packed separately)
◊ a set of liners (packed separately)
4. Finish the framing.

Unpack Appliance

Beware of sharp edges! Wear gloves!
1. Remove the cardboard wrapping and the wood
pallet from the appliance and discard.
2. Unpack any loose items from around the appliance.
3. Remove the window and set aside in a safe place to
avoid damage—see next page.
4. Verify that you have all the components required
for the installation, including:
◊ approved cement board;
◊ liners and fuel bed (in separate cartons);
◊ trim kit with barrier screen;
◊ venting components and accessories.

Fit Standoffs

The standoffs are supplied fl at on the fi rebox sides and
fi xed at one end. Swivel up the fl at standoffs, bend
them as shown and fi x the loose end to the top of the
fi rebox.
32

Installation Planning

5. Fit the appliance into framing and fi x it to the framing.
6. Remove the window of the appliance.
7. Install the venting system and tape vent pipe joints.
8. Position the restrictor.
9. Connect and test the gas supply.
10. Install the liners.
11. Install the middle platform supports.
12. Install the fuel bed.
13. Refi t the window and the hot glass safety plate if
removed.
14. Install the remote battery and wall switch kit.
15. Verify the operation and adjust aeration settings.
16. Instruct the homeowner on the operation and
maintenance of the fi replace.
17. Finish the wall around the fi replace.
18. Install the surround trim and barrier screen.

Installation

Standoffs installed
Standoff
Fold fl at
standoffs

Advertisement

Table of Contents
loading

This manual is also suitable for:

1500ipo

Table of Contents