Product Version; Release Notes; Document Organization; Referenced Documents - Hitachi compute blade 500 series Getting Started Manual

Hide thumbs Also See for compute blade 500 series:
Table of Contents

Advertisement

Product Version

This document revision applies to management module firmware A0240.

Release Notes

Read the release notes before installing and using this product. They may
contain requirements or restrictions that are not fully described in this
document or updates or corrections to this document.

Document Organization

The table below provides an overview of the contents and organization of this
document. Click the chapter title in the left column to go to that chapter. The
first page of each chapter provides links to the sections in that chapter.
Chapter 1, Preparing for installation
Chapter 2, Initial setup
Chapter 3, Powering on/off system
unit

Referenced Documents

BROCADE manuals
¢
¢
¢
¢
¢
¢

Document conventions

The term "Compute Blade" refers to all the models of the Compute Blade,
unless otherwise noted.
This document uses the following typographic conventions:
Convention
Regular text bold
xiv
Chapter
Access Gateway Administrator's Guide
Fabric OS Administrator's Guide
Fabric OS Command Reference Fabric OS Message Reference
Fabric OS Message Reference
Fabric OS MIB Reference
Web Tools Administrator's Guide
In text: keyboard key, parameter name, property name,
hardware labels, hardware button, hardware switch.
Hitachi Compute Blade 500 Series Getting Started Guide
Describes preparing for the installation of the
Compute Blade.
Describes setting up the Compute Blade before use.
Describes procedures to power on/off the system
unit.
Description
Preface
Description

Advertisement

Table of Contents
loading

Table of Contents