Sym Track Runner 200 Service Manual page 45

Table of Contents

Advertisement

To this chapter contents
3. LUBRICATION SYSTEM
Oil Pump Installation
Install the oil pump, and then tighten bolts.
Torque value:0.8~1.2kgf-m
Make sure that oil pump shaft can be rotated
freely.
Install oil pump driving chain and sprocket, and
then install snap ring onto oil pump shaft.
Install starting gear and generator.
(Refer to chapter 10)
3-6

Advertisement

Table of Contents
loading

Table of Contents