Sym Track Runner 200 Service Manual page 112

Table of Contents

Advertisement

To this chapter contents
9. FINAL DRIVING MECHANISM
Align the position mark on the shift spindle
Position mark
sprocket with that of shift drum, and then install
shift spindle.
10 bolts
Install dowel pin and new gasket.
Install gear box cover and bolts, and tighten.
Torque value: 1.0~1.4kgf-m
Apply with grease onto new oil seal lip, and then
install the shift spindle oil seal.
Special tool:
Oil seal driver (14x28x7)
Install the shift spindle bracket.
Add gear oil.
Gear oil quantity: 750c.c.
Shift spindle bracket
9-11

Advertisement

Table of Contents
loading

Table of Contents