Position Of The Thread Take-Up Spring Guard; Installing The Thread Take-Up Thread Guide B; Installing The Thread Take-Up - JUKI IP-100 Engineer's Manual

Lz-2290a series computer-controlled, direct-drive, high-speed, 1-needle, lockstitch, zigzag stitching machine
Hide thumbs Also See for IP-100:
Table of Contents

Advertisement

(17) Position of the thread take-up spring guard

(18) Installing the thread take-up thread guide B

(19) Installing the thread take-up

™ Fix the thread take-up with pressed in the direction of rotation.
Standard Adjustment
Standard Adjustment
1
Standard Adjustment
Tension disk
Stopper rubber
Thread take-up spring guard
1
Direction of rotation
1
24
NG

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc-915

Table of Contents