3. Attach gas line to fireplace gas regulator.
See Connecting to Gas Supply, page 14.
4. Check all gas connections for leaks. See
Checking Gas Connections, page 16.
IMPORTANT: When finishing your firebox,
combustible materials such as wall board,
gypsum board, sheet rock, drywall, plywood,
etc, must have 1/2" clearance to the sides
and top of the firebox. Combustible materials
should never overlap the firebox front.
CAUTION: Do not operate
fireplace without hood in place.
1. Fireplace hood is positioned on top of
shipping inner pack.
2. Remove top of firebox by removing 2 screws
located on each end (see Figure 11).
3. Insert the hood along the upper side of
the heat insulation board (see Figure 11).
Attach hood with 3 screws.
4. Reattach firebox top by reinserting the 2
screws from step 2.
200014-01A
INSTALLATION
Figure 10 - Rough Opening for Corner
ASSEMBLING HOOD
Step 1
Step 2
Hood
Step 3
www.usaprocom.com
Installation
Remove 2
Screws from Top
Firebox Panel
Insulation
Board
Replace 2
Screws
Figure 11 - Hood Installation
13

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FBD28T and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF