Piece Faceplate Installation - Regency Fireplace Products Horizon HZ40E-NG10 Owners & Installation Manual

Hide thumbs Also See for Horizon HZ40E-NG10:
Table of Contents

Advertisement

VERONA / 4 PIECE FACEPLATE INSTALLATION
1) When installing required Safety Screen - See "Safety Screen" instal-
lation instructions.
2) Install brackets onto the back of the faceplate - 3 screws for each
bracket in locations shown below.
3) To install the 4 piece faceplate - hook brackets (located on back of
faceplate) over the two middle tabs on the glass door frame.
If thicker fi nishing materials are used - the faceplate may be
adjusted out - up to 1/2".
919-073a
VERONA / 4 PIECE FACEPLATE INSTALLATION
+1/2"
+1/4"
Use fi rst notch in bracket
for standard installation
Important: 1/2" gap required between
faceplate and fi nished wall.
1
installation
HZ40E
Hook bracket over
these tabs
Final Install
05/16/12
Regency Horizon ® HZ40E-10 Gas Fireplace
|
53
|
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Horizon hz40e-lp10Horizon hz40e series

Table of Contents