Preparing The Subsystem And Powering On - Sans Digital Mobileraid MR8X Detailed User's Manual

Table of Contents

Advertisement

2.2 Preparing the Subsystem and Powering On

Here are the steps to prepare the RAID subsystem for use.
1. Attach network cable to the R-Link port and connect the other end of network
cable to your network hub/switch. Or as alternative for configuration, you may
connect the serial cable to the Monitor port and to the serial port of your
host/server.
2. Connect the SAS cable(s) to the SAS Host Channel(s) of the RAID subsystem and
to the SAS switch or SAS HBA on host/server.
3. Connect the power cord to the AC input socket. Plug the other end of power cord
to the power source.
4. Press on the Power Switch.
SAS-to-SATA II RAID Subsystem
Installation and Configuration Manual
26

Advertisement

Table of Contents
loading

Table of Contents