Clearances; Mantel & Trim; Alcove - Intertek Jotul GF 400 DV Sebago Installation And Operation Instructions Manual

Direct vent gas stove
Table of Contents

Advertisement

Stove and Vent Clearance
Requirements
Minimum Clearances from the Stove
to Combustibles:
See figs. 2-4.
Rear:
2" (51 mm)
Ceiling:
32 1/4" (819 mm)
Corner:
2" (51 mm)
Sides:
3" (76 mm)
Figure 2.
Parallel
Installation

Clearances.

3"
(76 mm)
2"
51 mm
Figure 3.
Corner Clearances.
Minimum Ceiling or Alcove Height
Figure 4a. Mantel and Trim Clearance specifications. Back of
bottom plate is flush with the fireplace face. Subtract 2 1/4" with
Short Legs.
2"
(51 mm)
To Rear Wall
3"
(76 mm)
2"
51 mm
Max. Mantel Depth
12.5”
10.25”
8”
5.75”
3.5”
Min. Mantel Depth
Max. Top Trim Depth = 1”
2” (5.1cm)
Minimum Clearances from the Vent Pipe to
Combustibles:
Horizontal Run:
Off the top of the pipe 2" (51 mm)
Off the sides and bottom 1" (25 mm)
Vertical Run:
All sides
Max. Mantel Depth
52.25”
58.25”
55.25”
148 cm
132.7 cm
140.3 cm
56.75”
53.75”
141.1 cm
136.5 cm
Figure 4b
Stove is installed with the top plate flush with the fireplace face.
Max. Mantel Depth
67.75”
61.75”
64.75”
172.1 cm
156.8 cm
164.5 cm
66.25”
63.25”
168.3 cm
160.7 cm
Figure 4c. Stove is installed recessed half-way into fireplace.
Top plate extends 6.5" forward of the fireplace face.
Alcove Installation
Maximum Alcove Depth: 24" (61 cm)
Minimum Alcove Width:
)Minimum Ceiling Height: 61" (155 cm)
With Short Legs (6") :
Alcove dimensions result from test configurations,
not stove clearance specifications.
137750_Rev_L 11.16.12
1" (25 mm)
12.5”
10.25”
8”
5.75”
Min. Mantel
3.5”
Depth
Max. Trim
Depth = 1”
48.25”
122.5 cm
28.5”
72.3 cm
12.5”
10.25”
8”
5.75”
3.5”
Min. Mantel
Depth
Max. Trim
Depth = 1”
6.5”
58.75”
29”
149.2 cm
74.7 cm
31 3/4" (80.6 cm)
59" (150 cm)
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents