Table of Contents

Advertisement

HOME

FRAME

REMOVAL
1.
Remove fuel from frame. See
4.25 FUEL
PUMP.
2.
Rotate engine. See
3.3 ENGINE ROTATION FOR SER-
VICE.
3.
Remove exhaust header. See
4.
Remove tail frame. See
BATTERY
PAN.
5.
Remove
rear
shock.
ABSORBER.
6.
Remove upper and lower fork clamps. See
CLAMPS, UPPER AND
7.
Remove main wire harness. See
NESS.
8.
Remove rear isolator fastener. See
REAR
ISOLATORS.
9.
See
Figure 2-88.
Lift and remove frame from the motor-
cycle.
INSTALLATION
1.
Place frame over the motorcycle.
2.
Install rear isolator fastener. See
REAR
ISOLATORS.
3.
Install main wire harness. See
NESS.
4.
Install upper and lower fork clamps. See
CLAMPS, UPPER AND
5.
Install rear shock. See
2.22 REAR SHOCK
6.
Install tail frame. See
BATTERY
PAN.
7.
Install exhaust header. See
8.
Rotate engine. See
3.3 ENGINE ROTATION FOR SER-
VICE.
2-60
2004 Buell Lightning: Chassis
DRAINING FUEL TANK
2.29 EXHAUST
SYSTEM.
2.37 LEFT TAIL SECTION AND
See
2.22
REAR
SHOCK
2.17 FORK
LOWER.
7.24 MAIN WIRE HAR-
2.20 FRONT AND
2.20 FRONT AND
7.24 MAIN WIRE HAR-
2.17 FORK
LOWER.
ABSORBER.
2.37 LEFT TAIL SECTION AND
2.29 EXHAUST
SYSTEM.
8483
in
Figure 2-88. Lift Frame Off Motorcycle (Typical)
2.21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents