REMEHA Quinta 45 Technical Information page 50

Hide thumbs Also See for Quinta 45:
Table of Contents

Advertisement

boiler
model
Fan speed
(rpm)
full
load
Quinta 45
5200
Quinta 65
5200
Table 16
Setting data
16.4. Check the flame via the inspection window. The flame should be stable, mainly
blue with burner surface covered by orange dots.
16.5. Run the boiler at part-load by pressing the 'm'- and [-]-keys simultaneously.
16.6. When part-load speed is reached, check values against the table and adjust if
necessary using the screw on the combi valve (see fig. 21).
16.7. Check the flame via the inspection window. The flame should be stable, with a
regular orange flame distribution.
16.8. Check the ionisation level, measurement in Volts between terminal 4 and earth,
minimum 4 µA
(1 V dc ≡ 1 µA dc).
NOTE: The full load adjustment changes the gas/air graph slope angle, whilst the part
load adjustment shifts the base point on a parallel axis, each adjustment therefore
alters the previous setting slightly. Repeat the process 16.2 to 16.7 and re-check the
values as many times as necessary until they are correct at both loads.
17. Remove the flue gas analyser. Seal the test point.
18. Fit the boiler front panel.
19. Allow boiler to run up to its set flow temperature and shut off.
20. When pumps have stopped, vent the system and check the water pressure.
21. The boiler is now ready for use.
22. Check system controls.
23. Set system controls to the required values
NOTE: The Remeha Quinta 45 and 65 is supplied with a number of factory default set-
tings which should be correct for most installations. If other setting values are required:
see Par. 6.5 and 6.6.
natural gas
O
CO
2
part
%
%
load
1100
4.8
9.0
+/- 0.1
+/- 0.1
1200
51
propane
Fan speed
2
(rpm)
full load
part load
4600
1100
4600
1200
O
CO
2
2
%
%
4.8
10.7
+/- 0.1
+/- 0.1