14. Use manual override to start the boiler.
15. The boiler should start with the run sequence indicated in the code-display, see
Par. 6.3.
16. Check the boiler for correct gas/air setup in full load and part load by measuring
the O
levels in the flue gas (direct measurement of CO
2
due to varying CO
Fig. 20
Flue gas measure point.
05W4H7900004
Correct gas/air setup:
16.1. Connect the flue gas analyser, ensuring the connections are gas tight.
16.2. Run the boiler at full-load by pressing 'm'- and [+]-keys simultaneously.
16.3. When full-load speed is reached, check values against the table and adjust if
necessary using the screw on the venturi (see fig. 21).
Fig. 21
Setting screws
00W4H7900005
levels in the natural gas). Proceed as follows:
2
can lead to inaccuracies
2
50