Installation Of Fire; Unpacking The Fire; Installing The Fire Box - Flavel Linear Pebble Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

INSTALLATION OF FIRE

2.1

UNPACKING THE FIRE

Carefully lift the fire out of the carton. Remove the loose item packaging carefully
from the front of the appliance. Check the contents as listed :-
Packing Check List
1off
Fire box / burner assembly
1off
Boxed pebble base, ceramic front rail and 14 synthetic pebbles
1off
Loose items bag.
1off
Cable Fixing Kit
1off
Linear trim
1off each User instruction book and Installation book
1off
Linear Ashpan
2.2

INSTALLING THE FIRE BOX

Establish which type of flue you are intending to install the fire in to :-
225 x 225mm (9 inch x 9 inch) brick built chimneys
175mm (7 inch) diameter lined brick or stone flue, or insulated pre-fabricated
metal flue box to B.S. 715.
When installing into 125mm (5 inch) diameter lined brick or stone flue, or
insulated pre-fabricated metal flue box to B.S. 715 and pre-cast flues the
restrictor baffle must not be fitted.
A spillage test must always be carried out to check satisfactory
clearance of flue products, regardless of the type of flue the
appliance is being fitted to.
Supplied By www.heating spares.co Tel. 0161 620 6677
SECTION 2
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents