Dispenser Preparation - Follett HCC1000AHS Installation Instructions Manual

Table of Contents

Advertisement

Prepare the dispenser.
3.1
Top preparation
(127mm)
• Locate hole position 5" (127mm) from
back of dispenser top
• Cut 3" (77,2mm) diameter hole in
dispenser top
3.3
Top preparation
• Apply gaskets
• Install shuttle actuator
dispenser top and secure with locking
nut
6
5"
3" ∅
(76,2mm)
through

Dispenser preparation

3.2
Top preparation
• Remove protective tape from gaskets
3.4
Top preparation
• Screw 4" (102mm) extension
bottom of shuttle actuator
HARMONY • SATELLITE-FILL
self-contained
3
into

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents