Replacement Of The Battery Module; Tower Models - MGE UPS Systems Pulsar Evolution 1100 Tower Installation And User Manual

Mge ups systems installation and user manual pulsar evolution 1500 tower/1500 rack 1100 tower/1100 rack 800 tower/800 rack 500 rack
Table of Contents

Advertisement

4.2 Replacement of the battery module

Tower models

Safety rules
Servicing of batteries should be performed or supervised by personnel knowledgeable of batteries and required
precautions. Keep unauthorized personnel away from batteries. Batteries constitute a danger (electrical shock,
burns). The short-circuit current may be very high. Precautions must be taken for all handling:
remove all watches, rings, bracelets and any other metal objects;
use tools with insulated handles.
Removal of the battery module
When replacing batteries, use the Battery Replacement Chart below to determine the correct battery.
This operation may be carried out with the UPS supplying power to the load.
C
A R
L S
io n
P U
lu t
E v o
0 0
1 1
B
D
A - Unclip the small plate with the MGE
logo on the front panel of the UPS.
B - Remove the two screws.
C - Remove the left-hand side of the front
panel by pulling it slightly up and then for-
ward.
D - Disconnect the battery module by
pulling apart the connectors (never pull on
the cables).
A
Battery Replacement Chart
Component
6V 7,2A Bat (in 800VA Rack)
12V 7,2A Bat (in 800VA Tower)
6V 9A Bat (in 1100VA Rack and 500VA)
12V 9A Bat (in 1100VA Tower)
4. Maintenance
Manufacturer
Manufacturer's
Catalog Number
Panasonic
LC-R067R2CH1
CSB
GP1272F2
Panasonic
UP-RW0645CH1
CSB
HR1234wF2
- Page 23
3400723200/AC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents