Buffalo LinkStation LS-VL User Manual page 88

Hide thumbs Also See for LinkStation LS-VL:
Table of Contents

Advertisement

Using your LinkStation
Note: If power is turned off during a RAID rebuild, the RAID rebuild will continue when power is
restored.
[Confirm Operation] screen
When you perform any of the following tasks, a [Confirm Operation]
screen is displayed . To continue, enter the displayed number within 60
seconds and click [Apply].
• Change RAID array (Create/Delete)
• Delete Folder
• Restore Factory Defaults
• Format LinkStation
LinkStation User Manual
• Format Array or Disk
• Remove Disk
• Rebuild RAID array
87

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents