14 August 1997
9.9 PRESSURE ROLLER REPLACEMENT
1. Remove the hot roller (see Hot Roller Replacement)
2. Remove the lower fusing entrance guide [A] (2 screws).
3. Remove the fusing knob [B] (1 screw).
4. Remove the pressure roller [C] (2 C-rings, 2 bearings).
NOTE: 1) When reinstalling the lower fusing entrance guide, tighten the screws
using the middle hole on each side (this is the lowest fusing guide
position).
2) The standard pressure spring position is at the upper position.
[C]
[B]
51
PRESSURE ROLLER REPLACEMENT
A217R519.cdr
[A]