Mounting; Rack-Mounting; Figure 13: Grounding - Edge-Core ECS2000-10P Installation Manual

10-port layer 2 gigabit ethernet poe switch
Table of Contents

Advertisement

| Installing the Switch
C
3
HAPTER

Mounting

M
OUNTING
The switch can be mounted in a standard 19-inch equipment rack, wall
mounted, or on a desktop or shelf. Mounting instructions for each type of site
follow.
R
-M
ACK
OUNTING
Before rack mounting the switch, pay particular attention to the following
factors:
Temperature: Since the temperature within a rack assembly may be higher
than the ambient room temperature, check that the rack-environment
temperature is within the specified operating temperature range.
Characteristics" on page
Mechanical Loading: Do not place any equipment on top of the rack-
mounted unit.
Circuit Overloading: Be sure that the supply circuit to the rack assembly is
not overloaded.
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than direct
connections to the mains.

Figure 13: Grounding

2. Terminate the wire to
an earthed grounding
point.
63.)
1. Attach an insulated
grounding wire with the
screw onto the grounding
point.
– 44 –
("Physical

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents