Download Print this page
Edge-Core ECS2100-10T Quick Start Manual
Edge-Core ECS2100-10T Quick Start Manual

Edge-Core ECS2100-10T Quick Start Manual

10/28/52-port web-smart pro gigabit ethernet switch 26-port web-smart pro 10g ethernet switch
Hide thumbs Also See for ECS2100-10T:

Advertisement

Quick Star t Guide
10/28/52-Port Web-Smart Pro Gigabit Ethernet Switch
26-Port Web-Smart Pro 10G Ethernet Switch
1. Unpack the Switch and Check Contents
Rack Mounting Kit—two brackets and eight screws
Four adhesive foot pads
Power Cord—either Japan, US, Continental Europe
or UK
Console Cable—RJ-45 to DB-9 (Optional item)
Documentation—Quick Start Guide (this document)
and Safety and Regulatory Information
Note:
The ECS2100 series switches are for indoor use only.
Note:
For Safety and Regulatory information, refer to the
Safety and Regulatory Information document included with
the switch.
Note:
Other documentation, including the Installation
Guide, Web Management Guide, and CLI Reference Guide,
can be obtained from www.edge-core.com.
www.edge-core.com
ECS2100-10T
ECS2100-10PE
ECS2100-10P
ECS2100-28T
ECS2100-28P
ECS2100-28PP
ECS2100-52T
ECS2110-26T
– 1 –

2. Mount the Switch

a. Mounting in a Rack
1
Attach the brackets to the switch.
2
Use the screws and cage nuts supplied with the rack to
secure the switch in the rack.
Caution:
Installing the switch in a rack requires two
people. One person should position the switch in the rack,
while the other secures it using the rack screws.
Note:
The switch can also be installed on a desktop or shelf
using the included adhesive rubber foot pads.
b. Mounting in a Rack (ECS2100-10PE only)
1
2
Caution:
For safe operation, install the switch with RJ-45
ports facing up.
1
Set two screws in the wall 150 mm (5.9 in.) apart.
2
Slide the switch's wall mounting slots down onto the screws so
that the unit is secure.
1
2
E012017-AP-R02
150200001287A

Advertisement

loading

Summary of Contents for Edge-Core ECS2100-10T

  • Page 1: Mount The Switch

    Note: Other documentation, including the Installation Guide, Web Management Guide, and CLI Reference Guide, can be obtained from www.edge-core.com. Caution: For safe operation, install the switch with RJ-45 ports facing up. Set two screws in the wall 150 mm (5.9 in.) apart.
  • Page 2: Connect Power

    Verify that the external AC power requirements for the switch can be met as listed below: ECS2100-10T: AC 100-240 V, 50-60 Hz, 0.5 A ECS2100-10P: AC 100-240 V, 50-60 Hz, 2.1 A ECS2100-28T: AC 100-240 V, 50-60 Hz, 0.5 A ECS2100-28P: AC 100-240 V, 50-60 Hz, 3.2 A...
  • Page 3: Hardware Specifications

    Hardware Specifications 7. Connect Network Cables Switch Chassis Size (W x D x H) ECS2100-10T: 19.64 x 11.71 x 3.66 cm (7.73 x 4.61 x 1.44 in.) ECS2100-10P: 33.0 x 20.4 x 4.26 cm (12.99 x 8.03 x 1.67 in.) ECS2100-10PE: 24.0 x 15.5 x 2.65 cm (9.44 x 6.10...
  • Page 4 Quick Start Guide Immunity IEC 61000-3-3, 61000-4-2/3/4/5/6/11 Safety UL/CUL(UL60950-1, CSA60950-1) CB (IEC60950-1) CSA/NRTL (UL60950, CSA 22.2.No 60950) EN 60950-1:2006+A11:2009+A1: 2010+A12:2011+A2:2013 / IEC 60950-1:2005; Am1:2009; CSA22.2 No. 60950-1-07 2nd; UL 60950-1 2nd CB (IEC/EN 60950-1) – 4 –...