Basic Setup And Device Connections; Setup - Sentex SW2200 Installation Instructions Manual

Swing gate operator
Table of Contents

Advertisement

Basic Setup and Device
Connections

Setup

WARNING
Use only qualified electricians. Serious injury or death can occur from
electrical shock or entanglement in operator.
NOTE: Follow manufacturer's instructions for safety devices such as edges
and photo eyes.
1
Install the stop button (normally closed)
on J7 terminals. The operator will not
run without this button.
2
Turn off line power and battery power.
3
Release (unlock) the quick disconnect
(see Figure 16) and check that the gate
swings freely.
4
Lock quick disconnect (see Figure 16).
5
Turn line power on. The LCD screen
should display the "Limits Menu" if limits
have not been set.
CAUTION
The unit should not move. If it does,
shut off power and check all
connections before proceeding.
NOTE: The operator is shipped from the
factory without limits. If limits have been
previously stored, the men will read
"OPERATION NORMAL".
6
Check to see that the Limits' LEDs are
off.
7
See Figure 17. Screen should read
"LIMITS MENU"; press enter and + to
set limits.
8
Using the {+/-} buttons, run gate to the
closed position (crank and extension
arms to be lined up) and press enter to
set the close limit.

Basic Setup and Device Connections

UNLOCKED
LOCKED
Figure 16
Sentexsystems
Figure 17
14
01-G0181F16
01-16169F1
Doc 01-G0181
Rev A