Site Preparation; Pad Mounting - Sentex SW2200 Installation Instructions Manual

Swing gate operator
Table of Contents

Advertisement

Site Preparation

Pad Mounting

For pad mounting instructions, perform the steps below and refer to the Figures below.
1
Excavate to the depth required by
local code or below frost line.
2
Situate pad according to Figure 7.
3
Using a license and qualified
electrician, route wiring for operator
power and controls prior to pouring
concrete. Situate conduit on pad
as shown in Figure 5.
4
Pour concrete ensuring that the
pad is level and, 2" to 4" above
ground line.
5
Sink (4) 1/2" x 6" minimum length
L-bolts (not supplied) as detailed in
Figure 6 and Figure 7. The bolts
should protrude 1" above the pad.
The shipping crate bottom may be
used as a bolt pattern template.
6
Allow concrete to set for 2 days
before installing operator.
7
If there is existing concrete on the
site, use 1/2" anchor bolts (not
supplied) to secure the unit. If
needed, use washers to shim the
operator level with the gate.
NOTE: Local Codes - This
manual does not supersede
local codes for construction,
and was written to be used by
a qualified and licensed
electrician.
For non-standard installations or
retrofit applications, see Non-
Standard Installation on page 24
for instructions.
Site Preparation
AVAILABLE CABLE
ENTRY ZONE
(Keep All Conduits
Within Shaded Area)
4.50
1.37
1.50
3.25
0.75
13.50
TYP.
15.00
21.00
Figure 5
1"
Figure 6
GATE
COLUMN
HINGE PIN
21.00
13.50
7.50
OPERATOR
SHAFT
LOCATION
Figure 7
10
COVER
OUTLINE
1/2" ANCHOR BOLTS
FOUR (4) PLACES TYP.
01-G0181F5
6" min.
01-G0181F6
FENCE
35.75
40.50
4.75
ANCHOR BOLT
LOCATION
CABLE ENTRY
ZONES
01-G0181F7
Doc 01-G0181
Rev A