1
Turn off line power (at the circuit breaker/panel) and operator (operator switch
to off).
2
Attach power wiring (L1, L2, and ground).
3
Apply line power (115VAC). Check to see if the pilot light is on and the
operator power switch is still off. Check if operator does not run, beep or
function, and LED's are off.
4
Turn operator on. Listen for 2 beeps. The LCD should read "LIMITS MENU".
NOTE: If limits have been previously set, the menu will read
"OPERATION NORMAL", with the status displayed underneath it.
CAUTION
If you do not know the limit settings, reset limits according to the Basic
Setup and Device Connection chapter, starting on p. 14.