Kick Axle, Shift Shaft And Primary Drive Gear - Yamaha YZ250 Owner's Service Manual

Yz series
Hide thumbs Also See for YZ250:
Table of Contents

Advertisement

KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR

EC4C0000
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
EC4C8000
PRIMARY DRIVE GEAR
30 Nm (3.0 m•kg, 22 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
Extent of removal:
Extent of removal
Preparation for
removal
1
55 Nm (5.5 m•kg, 40 ft•lb)
1 Primary drive gear removal
Order
Part name
RPIMARY DRIVE GEAR REMOVAL
Drain the transmission oil.
Bolt (brake pedal)
Radiator hose 4
Bolt (push rod)
1
Kick starter
2
Crankcase cover (right)
3
Bolt (Primary drive gear)
4
Primary driven gear
5
Primary drive gear
6
Thrust plate
Q'ty
Refer to "TRANSMISSION OIL REPLACE-
MENT" section in the CHAPTER 3.
Shift the brake pedal downward.
Disconnect at water pump side.
Refer to "CYLINDER HEAD, CYLINDER
AND PISTON" section.
1
1
1
Only loosening
Refer to "REMOVAL POINTS".
1
Refer to "CLUTCH AND PRIMARY
DRIVEN GEAR"section.
1
1
4-40
ENG
Remarks

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yz250 tYz250 t1Yz 250 2005Yz 250 t 2005Yz 250 t1 2005

Table of Contents