Kick Axle, Shift Shaft And Primary Drive Gear; Primary Drive Gear View - Yamaha YZ125(N)/LC Owner's Service Manual

Yz series
Table of Contents

Advertisement

KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE
EC4C0000

KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR

EC4C8000
PRIMARY DRIVE GEAR
10 Nm (1.0 m•kg, 7.2 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
Extent of removal:
Extent of removal
Preparation for
removal
1
1 Primary drive gear removal
Order
Part name
RPIMARY DRIVE GEAR REMOVAL
Drain the transmission oil.
Clutch cable
Bolt (brake pedal)
Radiator hose 4
Bolt (push rod)
1
Kick starter
2
Crankcase cover (right)
3
Bolt (Primary drive gear)
4
Primary driven gear
5
Primary drive gear
GEAR
55 Nm (5.5 m•kg, 40 ft•lb)
Q'ty
Refer to "TRANSMISSION OIL REPLACE-
MENT" section in the CHAPTER 3.
Disconnect at engine side.
Shift the brake pedal downward.
Disconnect at water pump side.
Refer to "CYLINDER HEAD, CYLINDER
AND PISTON" section.
1
1
1
Only loosening
Refer to "REMOVAL POINTS".
1
Refer to "CLUTCH AND PRIMARY
DRIVEN GEAR"section.
1
4-38
ENG
Remarks

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yz125lcYz 125Yz125n1Yz125(n)

Table of Contents