Douwe Egberts Cafitesse 100 Service Manual page 29

Table of Contents

Advertisement

Service Manual Cafitesse 100
Insert both lower buttons (1) (Fig. 7).
Leave the upper button (2) free for
programming (Fig. 7).
Set the key to ON with dispensers
equipped with a key switch.
Mount the cup carrier (3) (Fig. 8).
Connect the water supply and open the
water stop valve in the water pipe.
Insert the power supply plug.
Switch on the main switch. Water should
now flow into the boiler.
Observe if the floater switches off.
The fan must now be operating to cool the
cooling compartment. The yellow LED (4)
extinguishes as soon as the cooling
compartment has reached the correct
temperature. (Fig. 8)
Place a container below the hot water
delivery tap (5) at the front of the dispenser
and open the tap. (Fig. 8)
Observe if the boiler is being refilled with
water at the same time.
WARNING:
There is the danger of being
scalded by hot water. Keep
hands and other parts of the
body away from the delivery
area.
Observe the floater wire (6) during the
filling process. In the beginning the floater
wire (6) should fall down and then rise.
This indicates that water is running into the
boiler faster than it is taken from it. (Fig. 9)
Stop actuating the hot water delivery tap to
allow the boiler to be filled completely.
Observe again if the floater wire switches
off.
07.2004
Installation / Putting into Operation
2
x x
x x
x
1
Fig. 7
4
xxxxx
OFF
ON
xxxxx
3
Fig. 8
Fig. 9
S T
O P
STOP
5
6
2 - 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents