Installing A Hot-Plug Drive - HP ProLiant ML110 Gen9 User Manual

Hide thumbs Also See for ProLiant ML110 Gen9:
Table of Contents

Advertisement

Connect all the drive cables.
13.
Install the system air baffle (on page 24).
14.
If removed, install the PCI air baffle
15.
Install the front bezel (on page 21).
16.
Install the access panel (on page 19).
17.
Return the server to an upright position.
18.
Connect each power cord to the server.
19.
Connect each power cord to the power source.
20.
Power up the server (on page 18).
21.

Installing a hot-plug drive

CAUTION:
all bays are populated with either a component or a blank.
To install the component:
Remove the drive blank.
1.
("Install the PCI air
To prevent improper cooling and thermal damage, do not operate the server unless
baffle" on page 22).
Hardware options installation 42

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents