HP ProLiant ML110 Gen9 User Manual page 82

Hide thumbs Also See for ProLiant ML110 Gen9:
Table of Contents

Advertisement

Install the TPM board. Press down on the connector to seat the board
8.
page 11).
Install the TPM security rivet by pressing the rivet firmly into the system board.
9.
Install the controller in slot 5.
10.
Install the system air baffle (on page 24).
11.
If removed, install the PCI air baffle
12.
Install the access panel (on page 19).
13.
Return the server to an upright position.
14.
Connect each power cord to the server.
15.
Connect each power cord to the power source.
16.
Power up the server (on page 18).
17.
("Install the PCI air
baffle" on page 22).
("System board
components" on
Hardware options installation 82

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents