Hardware options installation

Introduction

If more than one option is being installed, read the installation instructions for all the hardware options and
identify similar steps to streamline the installation process.
WARNING:
internal system components to cool before touching them.
CAUTION:
beginning any installation procedure. Improper grounding can cause electrostatic discharge.

Drive cage options

4-bay LFF hot-plug drive cage option

To install the component:
Power down the server (on page 18).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Place the server on its side.
3.
Remove the access panel (on page 18).
4.
Remove the front bezel (on page 20).
5.
If installed, remove the PCI air baffle (on page 22).
6.
Remove the system air baffle (on page 23).
7.
Disconnect all existing drive cage cables.
8.
To reduce the risk of personal injury from hot surfaces, allow the drives and the
To prevent damage to electrical components, properly ground the server before