CAUTION:
precautions before beginning any installation, removal, or replacement procedure. Improper
grounding can cause electrostatic discharge.
Power down the server (on page 18).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Place the server on its side.
3.
Remove the access panel:
4.
Loosen the access panel thumbscrews.
a.
Slide and remove the access panel from the server.
b.
Install the access panel
Install the access panel:
1.
Place the access panel on the chassis, and slide it towards the front of the server.
a.
To prevent damage to electrical components, take the appropriate anti-static
Operations 19