QUANTA STRATOS S210 Series S210-X2A2J Technical Manual page 57

Optimized 2-socket, 4-gpgpu 2u server
Table of Contents

Advertisement

I
H
I
GPGPU2 M
NSTALLING
ARDWARE
NSTALLING A
ODULE
M2075/M2090 SKU:
10~11 kg/cm
5.0~5.5 kg/cm
Installing GPGPU Riser Card
5. Align the screw holes on GPGPU2 assembly bracket with
Installing Screws (M2075/M2090)
the screw holes on the assembly.
6. Secure the brackets to the assembly with the screw(s).
2-24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents