Porsche 2012 911 GT3 CUP Technical Manual page 89

2012 porsche 911 gt3 cup
Hide thumbs Also See for 2012 911 GT3 CUP:
Table of Contents

Advertisement

6.2.4. Driveshafts
6.2.4.1. Tightening Instructions
6
It is recommended that new cars and/or newly fitted driveshafts should be
run-in for approximately 50 km at a maximum speed of 200 km/h at low
torque.
Only use Krytox grease to repack the joints when servicing
the driveshafts
Driveshafts already used must NOT be swapped from left
to right and vice versa
Grease quantity outer joint:
Grease quantity inner joint:
Porsche part number. (120g tube):
1. Tighten all bolts according to the attached order with 30 Nm
2. Tighten all bolts according to the attached order with 60 Nm
3. Tighten all bolts according to the attached order with 90 Nm
1
4
The bolts should be slightly oiled. These instructions have to be followed
after each loosening of the driveshaft screwing.
996.332.897.9A
3
5
2
150 g
140 g
86

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

911 gt3 cup 2011

Table of Contents