Preparing for installation
Integration of the two-stage version in the...
I
Lead appliance (two-stage) of
the heat pump cascade
II to IV Lag heat pump (two-stage) 1 to
3
Equipment required
Pos.
Description
Heat source
1
Heat pump stage 1
Note
For recommended compressor power cable, see page 15, on-site fuse pro-
tection (see from page 104 and 242)
3
Outside temperature sensor
2
Heat pump control unit (for the power supply, use a 3 x 1.5 mm
site fuse protection ≤ 16 A)
5
Circulation pump for cylinder heating (heating water side), heat pump stage
1
6
Secondary pump, heat pump stage 1
9
Heat pump stage 2
Note
For recommended compressor power cable, see page 15, on-site fuse pro-
tection (see from page 104 and 242)
qP
Secondary pump, heat pump stage 2
qQ
Circulation pump for cylinder heating (heating water side), heat pump stage
2
qT
Primary pump, heat pump stage 1
qZ
Primary circuit flow temperature sensor (for installation, see page 84)
qU
Primary circuit return temperature sensor (for installation, see page 84)
wT
Primary pump, heat pump stage 2
Electrical connection
For further information regarding the
PCBs, see from page 220.
42
(cont.)
2
cable; on-