Plumbing Manifold; Connections - Worcester GREENSTAR 24i Junior Installation Instructions Manual

Wall hung rsf gas-fired condensing combination boiler
Table of Contents

Advertisement

PRE-INSTALLATION
3.7

PLUMBING MANIFOLD

3.7.1

CONNECTIONS

Heating System
22mm compression fittings
DHW
15mm compression fittings
Gas
22mm compression fitting
Tab. 16
Use the fittings supplied in the Hardware literature pack.
• If the boiler pipes are to be run behind the appliance
ensure that the pipes pass through the slot in the
white cardboard guide (A). This is fitted to the boiler
frame.
Further guidance on pipe routing can be
found printed on the boiler template
(supplied with the boiler).
• For further ease of fitting, an optional Vertical Pre-
piping Assembly kit is available, comprising five
pre-formed copper pipes and an earth bonding strip.
Part number: 7 716 192 570.
• To cover the pipe work under the boiler, down to the
counter top, an optional "Below boiler pipe cover"
can be used.
Part number: 7 716 192 608
6
1
2
Fig. 16 Pipe dimensions
20
3
4
5
7
1 2 3
6
1
2
Fig. 17 Plumbing manifold
#
Function
1
CH Flow
2
DHW Outlet
3
Gas
4
Domestic Cold Mains In
5
CH Return
6
Condensate
7
Pressure Relief Valve
Tab. 17 Key to figures 16 & 17
6 720 644 741a (2010/10)
4 5
7
6720643895-11.1W
3
4
5
From left
Diameter
case edge
of pipe
70 mm
22 mm
135 mm
15 mm
200 mm
22 mm
267 mm
15 mm
330 mm
22 mm
35 mm
22 mm
367 mm
15 mm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 28i junior

Table of Contents