15 Reports

15.1 Start-up report

• Enter your signature and the date after completing the start-up activities.
Start-up activities
1.
Check for gas leaks
Fill the heating system
2.
-
Pre-pressure expansion vessel (refer to the installation
instructions for the expansion - vessel)
-
Heating system filling pressure
3.
Fill the condensate trap with water
4.
Write down the gas characteristics
5.
Bleed the gas supply valve
6.
Check the air/flue gas connection
7.
Checking the appliance configuration
8.
Measure the gas inlet pressure (working pressure)
10. Carry out a leakage test in operating conditions
11. Check and adjust the flue gases CO
12. Carry out a function test
-
Measure the ionization current
13. Measure the pH-value
14. Boiler settings
15. Final activities
-
CLose the boiler door and the control panel
-
Hand over
Confirming proper start-up
Tab. 27 Start-up report
Logamax plus GB162- 80/100 kW - Subject to modifications resulting from technical improvements!
Page Measurement results
39
39
40
Heat input
Heat output
41
41
42
42
45
45
emissions
2
45
46
Fill in the record book
47
48
Remarks
_____________ psi
_____________ psi
3
_____________ btu/ft.
3
_____________ btu/PM
_____________ " W.C.
_____________ ppm
_____________ μA
Company stamp/signature/date