Sym Joyride 125 Service Manual page 140

Hide thumbs Also See for Joyride 125:
Table of Contents

Advertisement

Install cylinder head.
Tighten 4 nuts and washers on the cylinder
head upper side, and then tighten 2 cylinder
head mounting bolts of cylinder head side
cover.
Torque value: 2.0~2.4 kgf-m
Install and tighten spark plug
Torque value: 2.0~2.4 kgf-m
Caution
This model is equipped with more
precision 4-valve mechanism so its
tighten torque can not be exceeded
standard value in order to avoid causing
cylinder head deformation, engine noise
and leaking so that motorcycle's
performance be effected.
Install cam chain on to sprocket and align the
timing mark on the sprocket with that of cylinder
head.
Align sprocket bolt hole with camshaft bolt hole.
Tighten the sprocket mounting bolt.
Caution
Make sure timing marks are matched.
Install a new O-ring onto thermostat and tighten
its mounting bolts.
Loosen sprocket chain tensioner and let it
contact with chain plate tightly. Tighten the
bolt cap of tensioner adjustment hole.
To this chapter contents
Insulator mounting bolt
The bolt cap of tensioner
adjustment hole
7. Cylinder Head / Valve
Cylinder head
mounting bolts
Thermostat mounting
bolt
Nuts
Timing mark
7-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents