Control System Installation - Buderus Logano G125 BE US/CA Installation And Service Instructions Manual

Low emissions and high efficiency oil boiler
Hide thumbs Also See for Logano G125 BE US/CA:
Table of Contents

Advertisement

7
Boiler Installation

7.6.2 Control System Installation

To remove rear top cover first unscrew two rear sheet
metal screws.
Carefully route the burner cable on the outside of the
insulation from the front of the boiler to the controls
location at the top of the boiler.
Slide plastic front tabs of control panel into the oval
shaped openings.
Slide the control panel forward.
Push forward on plastic snap tabs in rear of control to
engage them into the top panes square knock-outs.
Remove top cover of control panel. Remove cover
screws.
Secure control to top cover using small sheet metal
screws.
36
Fig. 29 Removal of rear top cover and top cover plate
Fig. 30 Installation of control
1 Plastic snap tabs
2 Plastic font tabs
3 Oval knock-outs
4 Square knock-outs
Fig. 31 Removal of top cover
1 Top cover screws
2 Sheet metal screws
Logano G125 BE - Specifications subject to change without notice.
1
2
3
4
1
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents