Strain Relief Installation; Top Rear Panel Installation - Buderus Logano G125 BE US/CA Installation And Service Instructions Manual

Low emissions and high efficiency oil boiler
Hide thumbs Also See for Logano G125 BE US/CA:
Table of Contents

Advertisement

7
Boiler Installation
7.6.4 Electrical Connections
Install a power supply point near the boiler in accor-
dance with local and state code.
DANGER OF FIRE
Electrical wiring can be damaged by hot
boiler parts.
WARNUNG!
Make sure that all tubing and wiring
components are all placed on top of the
boiler insulation.
Ensure that the unit is properly ground-
ed.
Route all electrical wiring through the top cover race
way and install wiring per electrical schematics in
Logamatic manuals (

7.6.5 Strain Relief Installation

Secure all electrical wiring near the Logamatic using the
furnished plastic cable ties.
Install cable clips with the tab facing up into the rear
of the Logamatic (step 1).
Slide cable clips down and lock them in (step 2).
Push cable clips in (step 3).
Push hinging tab down to secure cable (step 4).

7.6.6 Top Rear Panel Installation

Put control top cover back and secure.
Install rear top panel on boiler.
38
Chapter 14, page 67).
Fig. 35 Secure wiring with cable clips
1
Fig. 36 Installation of rear top cover
1 Control top cover
2 Rear top panel
Logano G125 BE - Specifications subject to change without notice.
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents