Inspection And Service Reports - Buderus 800-24 Installation And Servicing Instructions

Wall hung condensing
Hide thumbs Also See for 800-24:
Table of Contents

Advertisement

7
Reports
7.2

Inspection and service reports

The inspection and maintenance reports provide an overview of all the tasks and operations carried out.
See section 3: "Inspection" (page 32) and section 4: "Maintenance" (page 33).
Please check off the inspection and/or requirement-related maintenance tasks carried out and enter the corresponding readings.
Sign details of inspection and maintenance tasks, indicating date carried out.
Use only original replacement parts.
Inspection work
1.
Check the general condition of the installation
2.
Visual and functional inspection of the installation
3.
Check the gas and water transporting parts for:
­ internal leaks (see chapter 3.2 on page 32)
­ visible corrosion (see chapter 3.3 on page 32)
­ ageing
4.
Check pollution of the burner, heat exchanger and siphon
(see chapter 4.1 on page 33)
5.
Check the ionization electrode and incandesent firing electrode
(see chapter 4.1 on page 33)
6.
Measure the ionization current
(see chapter 2.2.7 on page 30)
7.
Measure the gas distribution pressure
(see chapter 2.2.3 on page 27)
8.
Check the gas/air ratio
(see chapter 2.2.4 on page 28)
9.
Gas leak test in operational condition
(see chapter 2.2.7 on page 30)
10.
Measure the carbon monoxide content (CO), vacuum
(see chapter 2.2.6 on page 30)
11.
Pressure-testing of heating system:
- Inlet pressure of expansion vessel
(see chapter 2.1.1 on page 22 + instructions supplied with the
vessel)
- filling pressure (see chapter 2.1.1 on page 22)
12.
Check combustion air/flue gas pipes for correct functioning
and safety (see chapter 5.3.4 on page 47)
13.
Check requirement-related adjustment settings of control device
(see documentation supplied with control unit)
14.
Final check of inspection tasks, with record kept
of measurement readings and test results
15.
Confirm servicing work
Confirmation of professional servicing work
(Company stamp, signature)
Subject to modifications resulting from technical improvements !
64
Installation and servicing instructions condensing gas boiler 800 - 24/29/43/60 and 800 - 24T25/29T25 H/V • edition 02/2006
Date: _____________
µA
–––––––––––––––––––
mbar
–––––––––––––––––––
Pa
––––––––––––––––––––
ppm
––––––––––––––––––––
mbar
–––––––––––––––––––
mbar
–––––––––––––––––––
Buderus • http://buderus-domestic.co.uk
Date: _____________
µA
–––––––––––––––––––
mbar
–––––––––––––––––––
Pa
––––––––––––––––––––
ppm
––––––––––––––––––––
mbar
–––––––––––––––––––
mbar
–––––––––––––––––––