Minimum side clearance required for all boilers is 100 mm (4")
Subject to modifications resulting from technical improvements !
Installation and servicing instructions condensing gas boiler 800 - 24/29/43/60 and 800 - 24T25/29T25 H/V • edition 02/2006
800 - 24T25H / 800 - 29T25H
900
mm (35 ")
335
115
mm
(13 ")
1
(4 ")
7
420 mm
(16 ")
1
2
55
75
300
75
1
(3")
(2 ")
(11 ")
4
(3")
7
5
=
hot water outlet 15 mm dia.
=
cold water inlet 15 mm dia.
=
gas connection R½ (800 - 24T25H/29T25H)
=
boiler return line 28 mm dia.
=
boiler flow line 28 mm dia.
=
condensate water drain 32 mm dia.