Inspection And Service Reports - Buderus 800 User Manual

Wall-mounted condensing gas boiler
Table of Contents

Advertisement

7
Reports
7.2

Inspection and service reports

The inspection and maintenance reports provide an overview of all the tasks and operations carried out.
See section 3: "Inspection" (page 34) and section 4: "Maintenance" (page 35).
Please check off the inspection and/or requirement-related maintenance tasks carried out and enter the corresponding readings.
 Sign details of inspection and maintenance tasks, indicating date carried out.
Use only original replacement parts.
Inspection work
1.Check the general condition of the installation
2.Visual and functional inspection of the installation
3.Check the gas and water transporting parts for:
­ internal leaks (see chapter 3.2 on page 34)
­ visible corrosion (see chapter 3.3 on page 34)
­ ageing
4.Check pollution of the burner, heat exchanger and siphon
(see chapter 4.1 on page 35)
5.Check the ionization electrode and incandesent firing electrode
(see chapter 4.1 on page 35)
6.Measure the ionization current
(see chapter 2.2.7 on page 32)
7.Measure the gas distribution pressure
(see chapter 2.2.3 on page 29)
8.Check the gas/air ratio
(see chapter 2.2.4 on page 30)
9.Gas leak test in operational condition
(see chapter 2.2.7 on page 32)
10.Measure the carbon monoxide content (CO), vacuum
(see chapter 2.2.6 on page 32)
11.Pressure-testing of heating system:
- Inlet pressure of expansion vessel
(see chapter 2.1.1 on page 23 + instructions supplied with the
vessel)
- filling pressure (see chapter 2.1.1 on page 23)
12.Check combustion air/flue gas pipes for correct functioning
and safety (see chapter 5.3.4 on page 49)
13.Check requirement-related adjustment settings of control device
(see documentation supplied with control unit)
14.Final check of inspection tasks, with record kept
of measurement readings and test results
15.Confirm servicing work
Confirmation of professional servicing work
(Company stamp, signature)
68
Wall-mounted condensing gas boiler Buderus 800 - Subject to modifications resulting from technical improvements!
Date: _____________
µA
–––––––––––––––––––
mbar
–––––––––––––––––––
Pa
––––––––––––––––––––
ppm
––––––––––––––––––––
mbar
–––––––––––––––––––
mbar
–––––––––––––––––––
Date: _____________
µA
–––––––––––––––––––
mbar
–––––––––––––––––––
Pa
––––––––––––––––––––
ppm
––––––––––––––––––––
mbar
–––––––––––––––––––
mbar
–––––––––––––––––––

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents