Installation Overview

Figure 3 summarizes the overall installation procedure for the PathBuilder
S330/S310 switch.
Figure 3 General Installation Procedure
Prepare the Site:
Verify clearance around the shelf site
Fabricate and run cabling and wiring
Step 1
Install the optional modules
(optional)
Step 2
Install the unit in the rack
Step 3
Step 4
For detailed descriptions of the installation steps, see "Installation Procedures"
later in this chapter.
Connect AC or DC power and
(optionally) the RPS system
Connect I/O cabling and wiring
Connect the management
Step 5
terminal