84
C
4: C
HAPTER
ONFIGURING
P
B
S330/S310 M
ATH
UILDER
Figure 75 Add Group Menu (Adding IMA Group)
6 Select [1] Set Admin. Port(s). The following prompt appears at the bottom of the
screen:
Enter Admin Port(s) (1..4):
7 Enter the port numbers for the T1/E1 ports you want to include in the group. You
can use a hyphen to indicate a range of ports. For example, to include ports 1-3 in
a group you could enter
8 Specify any of the following information (by selecting the appropriate options and
responding to the prompts that appear at the bottom of the screen) to configure
the IMA group.
Frame Length — The frame length: 32, 64, 128, 256.
Max. Link Delay — The maximum link differential delay allowed in the group: 0
to 70 msec.
Min Tx/Rx Startup Ports — The minimum number of ports in the group that
must be operational in order for the group to come up: 1 to n, where n is the
number of ports in the group.
Min Tx/Rx Oper. Ports — The minimum number of ports in the group that must
be operational in order for the group to come up and be operational: 1 to n,
where n is the number of ports in the group.
IMA ID — A user-selected number to identify the IMA group.
Test Link — The port number of the link that is to perform the test procedure.
Test Pattern — The pattern to be looped back in the test procedure: 0-254.
Test Procedure — Enables or disables the test procedure. When the test
procedure is enabled, the test pattern is sent out on the designated test link and
then looped back on the other links in the group.
Admin Status — The administrative status of the group: In Service or Out of
Service.
9 Select [11] Previous Menu.
10 If desired, repeat steps 5-8 to set up another IMA group.
, P
,
A
ODULES
ORTS
AND
PPLICATIONS
.