Daikin Super Multi NX C-Series Service Manual page 257

Super multi nx c-series
Table of Contents

Advertisement

Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Step
5
Lift up the control PCB.
6
Disconnect each wire
harness connector
linked to the control
PCB.
S31 (Pin 9): To CN14
S32 (Pin 5): To CN11
S33 (Pin 10): To S34
S71 (Pin 8): To S72
246
Procedure
ECN1 (green)
Points
H1 (yellow)
H2 (blue)
Removal Procedure
SiE12-411

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents