14. Dynabolts in Base: Drill four (4) x 8 mm holes in the slab or solid base.
Insert the four (4) x 8 mm (M6) dynabolts provided, into the slab or
solid base.
Ensure the collar of the dynabolt does not protrude above the surface
of the slab or solid base.
Position the dynabolt nuts so they are at least 5 mm above the slab,
to allow the heat pump module‟s feet to slide into place against the
bolts.
Step 14
drill holes in slab or solid base
and insert dynabolts
21
HEAT PUMP AND TANK ASSEMBLY