Download Print this page

Rheem MPs Series Installation Instructions Manual page 13

Mps series air sourced split heat pump module

Advertisement

ASSEMBLY PROCEDURE
Warning: The heat pump must be assembled, plumbed, filled with water
and purged of air prior to power being connected and switched on.
The following procedure is to be followed to install the heat pump module in
position and connect to the heat pump storage tank.
1.
Heat Pump Storage Tank: Remove all packaging including the carton
base from the storage tank and position in its intended location, supported
by a level slab or solid base.
The cold and hot water connections may be on either the left or right hand
side, and should be parallel to the wall.
The heat pump flow and return connections are on the opposite side of the
heat pump storage tank to the cold and hot water connections. The heat
pump storage tank should be orientated so these connections face the
location of the heat pump module. This will allow for an easier and neater
installation of the heat pump flow and return pipe work.
2.
Heat Pump Module: Remove all packaging including the carton base
from the heat pump module.
Set aside the carton liner piece marked "(DO NOT REMOVE)" as this
contains the template which is required to locate the position of the
holes to be drilled to connect the heat pump module bracket to the
wall and the heat pump feet to the supporting base.
Remove the heat pump module‟s rear access panel from the carton
liner and set aside.
3.
Kit Bag and Cable Set: Through the opening at the rear of the heat pump
module:
Remove the kit bag and set aside
Withdraw the cable set and the two flexible braided hoses.
HEAT PUMP AND TANK ASSEMBLY
13

Hide quick links:

Advertisement

loading

This manual is also suitable for:

180536 r180540 e180536180540