Installing The Base Telephone Equipment; Important First-Time Installation Information; Before You Start - Nortel T7406E Installation And Configuration Manual

Hide thumbs Also See for T7406E:
Table of Contents

Advertisement

Chapter 3

Installing the base telephone equipment

Complete the following procedures to install the T7406E system equipment:
Installing the handset charging cradle
Installing the battery pack
Charging the battery pack for the first time
Securing the base station mounting bracket
Connecting the telephone line and power adapter to the base station
Mounting the base station

Important first-time installation information

When performing the initial configurations on the handset, ensure that all the handsets you intend
to configure have fully-charged battery packs installed.
Because the handsets start scanning as soon as they are powered, you must set the handset IDs
before you configure the handset to avoid conflicts between handset signals and the possibility of
one set mirroring another.
For information on wiring your system, refer to

Before you start

Before you install the base station, ensure that
the telephone lines from your system have been installed at the base station location
there is an ac power outlet within 1.5 meters (5 feet) of the base station location
you have removed the mounting bracket from the base station
Appendix B, "Wiring information," on page
T7406E Cordless Handset Installation and Configuration Guide
35
53.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents