3-14 Compaq ProLiant ML350 Setup and Installation Guide
4. Insert the hot-plug hard drive into the lowest available hot-plug drive
bay
and close the ejector lever
Figure 3-16. Inserting the hot-plug hard drive and closing the ejector lever
To remove a hot-plug-hard drive reverse these procedures.
IMPORTANT: A hard drive blank must be installed into the empty drive bay or the system
will not operate properly.
For use with 1-GHz or greater Intel Pentium III processor-based server models only
.
1
2