Parallel Installation:
Minimum Clearance and Flue Centerline
48"
(1220mm)
Max. Alcove
Depth
6"
(150mm)
ST130
Fig. 3 Parallel installation, minimum back and side clear-
ances, and flue centerlines.
Corner Installation:
Minimum Clearance and Flue Centerline
18"
(457mm)
18"
(457mm)
6"
(150mm)
Fig. 4 Corner installation, minimum corner clearances and
flue centerline.
30004967
42" (1070mm)
Min. Alcove Width
4" (102mm)
6"
(150mm)
6"
(150mm)
Wall Centerline from Floor
Direct Vent Only
Effective Minimum
Centerline
Fig. 5 Minimum wall centerline.
Wall and Ceiling Clearances
Direct Vent Only
ST19
A: Rear Wall
B: Min. Clearance
C: Min. Alcove Height
ST101b
D: Max. Alcove Depth
Stardance
Direct Vent
Sidewall Clearance
Min. Clrnc
* needed for installing DuraVent Minimum Vent Kit #79 or
9/28/00 djt
MHSC Minimum Vent Kit #7TFSMSK.
Fig. 6 Dimensions and clearances to ceiling or alcove.
The Radiance Heater must be installed on rigid flooring.
When the heater is installed directly on any combustible
surface other than wood flooring, a metal or wood panel
extending the full width and depth of the unit must be
used as the hearth. There are no other hearth require-
ments.
Radiance Direct Vent Gas Heater
A
A
57" (1448 mm)
(MHSC Pipe)
55" (1399 mm) (Simpson DuraVent Pipe)
ST131b
Stardance
wall thimble
9/28/00 djt
D
B
C
A
4" (10 mm)
44" (1118 mm)*
7" (1830 mm)*
48" (10 mm)
6" (150 mm)
Hearth Requirements
ST131b
ST101b
7