Parallel Installation:

Minimum Clearance and Flue Centerline
48"
(1220mm)
Max. Alcove
Depth
6"
(150mm)
ST130
Fig. 3 Parallel installation, minimum back and side clear-
ances, and flue centerlines.
�����
������ �����
�����

Corner Installation:

Minimum Clearance and Flue Centerline
18"
(457mm)
18"
(457mm)
� �
6"
(150mm)
Fig. 4 Corner installation, minimum corner clearances and
flue centerline.
20012697
42" (1070mm)
Min. Alcove Width
4" (102mm)
6"
(150mm)
6"
(150mm)
� �
�����
������ �����
�����
Direct Vent Only
Effective Minimum
Centerline
Fig. 5 Minimum wall centerline.

Wall and Ceiling Clearances

Direct Vent Only
ST129
A: Rear Wall
B: Min. Clearance
C: Min. Alcove Height
ST101b
D: Max. Alcove Depth
Stardance
Direct Vent
Sidewall Clearance
Min. Clrnc
* needed for installing DuraVent Minimum Vent Kit #2792 or
9/28/00 djt
CFM Corporation Minimum Vent Kit #7TFSMSK.
Fig. 6 Dimensions and clearances to ceiling or alcove.
The Radiance Heater must be installed on rigid flooring.
When the heater is installed directly on any combustible
surface other than wood flooring, a metal or wood panel
extending the full width and depth of the unit must be
used as the hearth. There are no other hearth require-
ments.
Radiance Direct Vent Gas Heater
Wall Centerline from Floor
A
A
57" (1448 mm)
(CFM Corporation Pipe)
55" (1399 mm) (Simpson DuraVent Pipe)
ST131b
Stardance
wall thimble
9/28/00 djt
D
B
C
A
4" (102 mm)
44" (1118 mm)*
72" (1830 mm)*
48" (1220 mm)
6" (150 mm)

Hearth Requirements

ST131b
ST101b
7